Latest News Archive

Goals for Week of April 21st - April 25th

Monday Tuesday Wednesday Thursday Friday
matrix of known component groups

TestDevelopment now available

G.beta due MIDNIGHT

Use DropOff (requires secure login)

G.beta format

 

  Course
Review

 

Final Exam!

I am not kidding, check the syllabus

Status Status   Status Status

Unchanged...

Goals for Week of April 14th - April 18th

Monday Tuesday Wednesday Thursday Friday
G.alpha due MIDNIGHT

Use DropOff (requires secure login)

G.alpha format

 

 

MQP Project Presentation Day

    matrix of known component groups

Steering Committee meeting 2PM in FL320

      Status Status

Latest News

  1. [4/18/08 9:32 AM] Updated Status to show how IIconImage is in place
  2. [4/18/08 9:18 PM] How to write a component that requires special code libraries. Useful for database manager.
  3. [4/18/08 1:57 PM] Notes for class.
  4. [4/18/08 1:21 PM] Steering Committee meeting in FL 320 at 2PM today. Agenda. Handout.
  5. [4/16/08 1:22 PM] Good news. I now have a fully working version of the skeleton Kombat Solitaire working from within the CompUnit component technology.

    To access, follow this tutorial.
     

  6. [4/15/08 1:10 AM] Ran out of time in posting material to get you started on your implementation. This will be priority in the morning; hope to complete by noon.
  7. [4/15/08 9:39 PM] Having trouble finding out how to get started? Make sure you try this tutorial.
  8. [4/15/08 1:23 PM] Status of KS infrastructure code (updated daily).
  9. [4/15/08 7:39 AM] Either I have an incredible ability to focus or I am a space cadet. There is no class today because of MQP Project Presentation Day. I encourage you to attend!
  10. [4/12/08 5:49 PM] Sample G.alpha packaged components for server-side components can be found in Framework project, under components. Update the project in Eclipse to get my sample for sipc, communicator, mbus.
  11. [4/11/08 11:01 PM] Results of Steering committee.
  12. [4/11/08 9:42 AM] Steering Committee meeting in FL320 right after class. Agenda.

Goals for Week of April 7th - April 11th

Monday Tuesday Wednesday Thursday Friday
  G.Analysis

G.Interfaces

CompUnit Hello, World tutorial

   

 

A1.impl due MIDNIGHT

Use DropOff (requires secure login)

4PM Steering Committee meeting

        G.alpha assigned

Latest News

  1. [4/12/08 5:49 PM] Sample G.alpha packaged components for server-side components can be found in Framework project, under components. Update the project in Eclipse to get my sample for sipc, communicator, mbus.
  2. [4/11/08 11:01 PM] Results of Steering committee.
  3. [4/11/08 9:42 AM] Steering Committee meeting in FL320 right after class. Agenda.
  4. [4/8/08 9:59 PM] Updated StandAlone to remove 'Green wall of death'. Update to get fix.
  5. [4/8/08 1:45 PM] Handouts for today (PPT and TXT)
  6. [4/8/08 10:44 AM] To ensure proper consistency across all platforms, I am moving all code projects to JDK 1.6.0_05 (the latest download release from Sun Microsystems). You should do the same.
  7. [4/7/08 10:17 PM] Fully working set of component examples in Development and Framework projects (make sure you update both). See Tutorial for how to run.
  8. [4/7/08 7:44 PM] Format for G.interfaces
  9. [4/7/08 10:29 AM] Posting instructions for submitting A1.impl on Friday.

Goals for Week of March 31st - April 4th

Monday Tuesday Wednesday Thursday Friday
G.Analysis A1.design due

CompUnit Hello, World tutorial

   

 

A1.correctness due MIDNIGHT

Use DropOff (requires secure login)

Groups are now assigned their tasks A1.correctess assigned   A1.design comments returned  

Latest News

  1. [4/4/08 2:17 PM] Published sample code for skeleton group project components.
  2. [4/3/08 11:08 PM] Note that A1.correctness is due by Midnight tomorrow night. As incentive, I have six test cases for my Narcotic plugin and that is enough to put me over the 80% barrier for all of the classes of my plugin (i.e., all moves and all controllers). Expected Format Here.
  3. [4/3/08 11:07 PM] Added test case for double-click on Narcotic game. Available via update from the SolitairePluginTutorial project.
  4. [4/1/08 12:19 PM] Discussion Forum areas created for each component type on sourceforge.
  5. [4/1/08 12:15 PM] Handout for today: Important Information on Group Project.
  6. [4/1/08 10:03 AM] When you 'update' StandAlone, you will get some resource errors. Click OK and then update again and all will be well (some of the tiny cards were named improperly and didn't work on Mac's and Linux boxes).
  7. [3/30/08 11:59 PM] Tutorial for understanding KS Framework.
  8. [3/30/08 2:48 PM] Group Notes.
  9. [3/30/08 1:41 PM] Group Project tasks assigned.
  10. [3/30/08 9:31 PM] Tutorial on JUnit testing for Solitaire plugins now available.
  11. [3/30/08 2:58 PM] We are ramping up on the CompUnit component technology needed for the group project. CompUnit Hello, World tutorial is now available.
  12. [3/30/08 10:46 AM] SourceForge Wiki has all information on group project.
  13. [3/27/08 12:34 PM] Check out revised BadNarcotic example [src] [original] (Thanks to Joe Politz for implementing undo).

Goals for Week of March 24th - March 28th

Monday Tuesday Wednesday Thursday Friday
  A1.analysis due

 

  assign A1.design

 

assign CompUnit Tutorial
A1 Assignment Matrix (a reminder) RAD document handout   A1.analysis comments returned  

Latest News

  1. [3/27/08 12:34 PM] Check out BadNarcotic example [src]
  2. [3/27/08 11:24 AM] Revised reading assignment for Monday [8.1 - 8.3]
  3. [3/23/08 8:51 PM] A1.analysis due on Tuesday.
  4. [3/23/08 8:40 PM] Group project to be assigned this week. Get Ready To Rumble!
     

Goals for Week of March 17th - March 21st

Monday Tuesday Wednesday Thursday Friday
G.select due

 

A1.model due   assign A1.analysis

 

assign Solitaire Plug-in Tutorial
A1 Assignment Matrix (a reminder) Group Project matrix to date   A1.model comments returned  

Latest News

  1. [3/20/08 11:34 PM] All groups now assigned. Please review!
  2. [3/20/08 12:29 AM] Specific format for A1.analysis now available.
  3. [3/17/08 10:47 AM] Note revised office hour schedule for Sunday b/c ADP lab doesn't open until 2PM.
  4. [3/17/08 10:06 AM] Sixes and Sevens also needs two packs. Check out enhanced description for further info.
  5. [3/16/08 6:31 PM] Rules for your variations are (still) posted here. Note Interregnum needs two packs.
  6. [3/16/08 6:30 PM] Looking for a group to join? Post to the SourceForge Discussion area under G.Select
     

Goals for Week of March 10th - March 15th

Monday Tuesday Wednesday Thursday Friday
  Introduce Class Project

Discuss Structure

assign A1.select

  assign G.select

A1.select due

assign A1.model
  Daily Question     Daily Question
  1. [3/14/08 11:26 PM] Final A1.select matrix assigned. Note A1.model due Tuesday in class.
  2. [3/14/08 11:25 PM] Updates to Solitaire Prototype allow chatting to see who else is on the system
  3. [3/14/08 12:28 PM] StarUML available here (for PC only). Macintosh users can get Visual Paradigm
     
  4. [3/13/08 10:39 PM] Interested in Eclipse 3.2.2 (older version which supports GUI building?). Note there may be a way to get Visual Editor to work in Europa Eclipse (thanks to Brian Tate).
  5. [3/13/08 11:42 AM] Start to become familiar with the Solitaire Prototype. Emphasis on Prototype!
  6. [3/13/08 11:35 AM] Coding Dojo to start Mondays at Noon. Details here.
  7. [3/11/08 11:13 PM] Beginning Thursday, students will be able to self-form into teams of size three. By Monday all student groups will be formed. Then we can begin the process of assigning groups to their respective projects.
  8. [3/11/08 11:09 PM] Added link for Office Hours in the table of contents on left.
  9. [3/11/08 8:30 PM] Download Eclipse Europa (3.3) from this link.
  10. [3/11/08 7:06 PM] Initial A1.select matrix assigned randomly. This will be finalized on Thursday night and will be all ready to go by Friday.
  11. [3/10/08] Join the Sourceforge.wpi.edu project "cs3733_heineman". Once you have created a SourceForge account (details here), visit here to join the project. I have to add each and every one of you, so do this early.
  12. [3/10/08] T-30 hours and counting...

heineman@cs.wpi.edu
04/28/08 12:30 AM